Objectives and Targets of the project

 Objectives and Targets of the project

  • To upgrade the KGDCL existing gas distribution network capacity from 350 MMSCFD to 500 MMSCFD to facilitate adequate gas supply to bulk and industrial customers of KGDCL.
  • To make arrangement for supplying 200 MMSCFD gas to the upcoming industrial customers in Mirsarai Economic Zone (MEZ), Chittagong from national gas network.
  • To construct dedicated pipelines to supply of gas from Anowara CGS to three bulk customers like KAFCO, CUFL & Sikalbaha Power Station (SPS), isolating them from existing ring main, to make necessary arrangements/modifications at Shahmirpur manifold station ofKGDCL to receive R-LNG from GTCL’s offtake to facilitate supply to the existing ring main.

E) Project Name: Access Road Project to Mirsarai Economic Zone by RHD

Project Length : 10.00 Km.

Objective

To provide cost effective, safe, less travel time and logical road network for all road users specially between Mirsorai Economic Zone and the capital Dhaka as well as the port city Chittagong through Dhaka-Chittagong National Highway. It is a specialized and dedicated roadway for carrying goods lo economic zone along with transferring finished products from this zone to home and abroad.

F) Project Name:Power Gird station and line construction by PGCB

To accelerate the economic development of the country through industrialization and creation of new employment, reliable and adequate power supply to the Economic Zone at Mirsarai is of utmost importance.

PGCB is constructing a new 230/33 kV GIS grid substation at Mirsarai Economic Zone. Initially this substation will be connected to 230 kV GIS grid substation at BSRM. The initial capacity of the  substation  is  2×120/180  MVA. A  17  km  400  kV  double  circuit  transmission line  is implementing to feed the substation.The substation is expected to commission in 2019. In future, Mirsarai 230/33 kV GIS grid substation will be upgraded to 400 kV voltage level and eventually will be connected to upcoming power hub at Karerhat 400/230/132 kV grid substation for a strong tie to the national Grid.

This 230/33 kV GIS grid substation will also help in evacuating the huge amount of power generated from upcoming power plants at Mirsarai that will be constructed in the adjacent areas in future.

G) Project Name:Installation of Telecommunications Network at Mirsharai Economic Zone in Chittagong by BTCL

Implementing agency : Bangladesh Telecommunication Company Limited

Duration of Project : January 2018 to December 2019

Project Cost : BDT. 10257.49 Lac

Sheikh Hasina Sarobar: Honorable Prime Minister Sheikh Hasina  has instructed to create water reservoir and rain-water harvesting  infrastructure in each  economic zone. In  compliance with this instruction, BEZA has ensured maintenance of existing water body and create new water reservoir and lakes in Mirsarai EZ. Three lakes, each one  having sizes of approximately 100 acres of land, are going to  be developed in this zone and the first one is in implementation stage. The lakes have been  named after Prime Minister Sheikh Hasina as Sheikh Hasina Sarobar and these lakes will promote tourist attractions assuring environmental protection of the whole zone.